Write the lessons down, then start the next project from them

Two lessons I would repeat on every project: get the specification signed off, and stay close to the client. A written report is how they survive into the next one.

Ionut Ilasi3 min read

Two lessons I would repeat

If I had to reduce what I have learned on delivery projects to two sentences, they would be these. Get the client's sign-off on the specifications, and do not imagine or speculate on our side. And stay as close to the client as possible, so that we add value and do not only deliver tickets.

Sign-off instead of imagination

When a requirement is unclear, the temptation is to fill the gap with what seems sensible. The team is capable and the deadline is close, so a guess feels efficient. It is efficient only until the client sees the result and it is not what they meant.

A written specification that the client has signed turns a guess into an agreement. If work has to start before the sign-off arrives, I write the assumption down and ask for confirmation, so that nobody is relying on memory. The sign-off itself does not need to be heavy: a short, dated confirmation from the right person is enough, as long as it exists.

A typical case: the specification says that users can export a report, and the team builds an Excel export. The client expected a PDF sent every week to managers. Both sides read the sentence honestly. A signed specification with a short example of the expected output would have caught it in the first week.

Closeness is not the same as agreement

Being close to the client does not mean saying yes to everything. It means understanding the business problem behind a request, so that we can suggest a better option, warn early and raise a risk before it becomes a surprise. A vendor that only executes can be replaced. A partner that helps the client decide is harder to replace.

In practice closeness is a set of small habits: asking to see the process people actually work in, joining a demo instead of sending notes, and calling when something looks wrong instead of writing a long email.

A workshop at the end of every project

Lessons stay in people's heads unless they are collected. At the end of a project I like to run a lessons-learned workshop and write a report. The next project does not start from a blank page: it starts from that report. A few rules keep the workshop useful:

This sits alongside the shorter reviews during delivery. The end-of-project workshop looks at the whole arc, from estimation and requirements to handover and support, and it catches patterns that no single iteration shows.

A lesson that nobody reads again was only a conversation. One that changes how the next kick-off is run was worth the time.

Previous articlePerformance is the hardest thing to put in an SLA Next articleA project ends at go-live, its benefits do not